PA-26-0797
Scheduled Roof Truss CampbellfieldPosi-STRUT floor system - Lot 658
Bellridge Developments · Lot 658, 50 Harvest Home Road, Wollert 3750
Value ex GST
$6,272
+ $627 GST = $6,899 inc
Proof of delivery
Not yet uploaded by the carrier
No photos against this docket
Photos are captured on site by the driver once the load is dropped.
Load
2 lines| Code | Description | Qty | UOM |
|---|---|---|---|
| PST-658 | Posi-STRUT floor system, open web joists | 29 | ea |
| PST-RIB | Posi-STRUT ribbon plate | 18 | lm |
These are the lines as they appear on the docket against ORD-118907. Pricing and stock stay where they are today.
Office notes
Saved against the docket, visible to the whole office
- Loading notes…
Docket timeline
-
Order taken
6:30am · ORD-118907
-
Truss set off the line, released to despatch
6:45am · RT-26-3533
-
Docket scheduled & carrier assigned
6:50am · Whittaker Cartage
-
Loaded at Campbellfield
Campbellfield
-
In transit to site
1PL 6ZW
-
Delivered on site
-
-
Proof of delivery captured
not uploaded
-
Docket closed out
ORD-118907
Driver
Driver- Mobile
- 0438 902 554
- Home depot
- Campbellfield
- Vehicle
- Flatbed rigid
- Rego
- 1PL 6ZW
Delivery preference
Booked 11:00-13:00
SWMS not required, non-crane drop
Builder
- Site contact
- Marty O'Dwyer
- Phone
- (03) 9744 2020
- ABN
- 87 155 402 663
- Terms
- COD
- Estate
- Aurora